E5® solutions stabilize the surface and reduce drag so crews can place, trowel, and close faster—without adding water or sacrificing long-term durability. The payoff is smoother, denser finishes, higher FF/FL, and fewer callbacks.
Reduce equipment drag and extend the workable window so finishers control the slab—not the weather.
Keep the water-to-cement ratio intact while improving surface workability and uniformity.
Build a harder, more abrasion-resistant wear layer that looks better on day one and lasts longer.
E5® leverages internal curing and surface chemistry to make concrete easier to place and finish while densifying the top layer. Crews get predictable closes and consistent sheen across large pours, and owners get long-lasting, low-maintenance floors.
Keep your team aligned, your data clear, and your deals moving forward. Everything you need to manage growth without second-guessing your next step.
Trowels can bite or chatter as the surface dries unevenly, increasing labor and risking burn marks. Drag shortens the finishing window and forces more passes to achieve sheen.
Excessive passes and heat create weak, polished paste that dusts early. Crews leave the job later, and owners inherit a surface that degrades sooner.
Adding water to “help” the close dilutes the paste and raises porosity right where durability matters most. Minor gains in workability trade off against long-term performance.
These areas telegraph as dusting, blotchy sheen, and premature wear. Warranty conversations get harder, and punch lists grow.
Wind and sun strip moisture from the surface, collapsing the finishing window. Timing becomes guesswork, and consistency suffers from panel to panel.
When the surface outruns the team, cold joints, streaks, and burns appear. Crews return for costly touch-ups that delay downstream trades.
Without a reliable aid, slabs close differently across a single placement—especially on big floors. The near-surface zone ends up variable in hardness and density.
That inconsistency shows up under side-lighting and polishing, and it drives callbacks after turnover. Ongoing maintenance rises to mask defects.
E5® Miracle Aid lowers surface friction so trowels glide instead of bite. Crews work with less fatigue and fewer passes, achieving uniform sheen more quickly. Lower drag also reduces the risk of burns and streaks on hot, dry, or windy days.
Miracle Aid boosts surface workability without changing the critical water-to-cement ratio. Finishers get time to close properly while preserving long-term strength and durability in the wear layer.
Applied during finishing, Miracle Aid stabilizes moisture at the interface, giving crews a predictable closing window. This leads to tighter paste, better edge work, and fewer defects that telegraph through coatings or polish.
E5® Internal Cure + E5® Catalyst react to form insoluble bonds and a harder, denser wear layer. The result is superior abrasion resistance, cleaner polishing, and a surface that looks better for longer.
E5® Shot Cure improves cohesiveness and reduces segregation/bleed in complex or high-flow mixes. Surfaces remain workable and finishable longer, supporting consistent outcomes on difficult geometry.
E5® products align with industry expectations for finishing quality and long-term performance (e.g., admixture performance under ASTM C494 Type S and field FF/FL measurement per ASTM E1155). Using recognized frameworks simplifies spec language and acceptance criteria.
Field programs confirm improvements via surface hardness/density checks, abrasion indicators, and finish flatness (FF/FL). Near-surface uniformity is corroborated by consistent sheen and reduced dusting under early service.
Projects report smoother closes with fewer passes, higher FF/FL, and reduced dusting/efflorescence. Owners see fewer appearance-related callbacks and slower wear in high-traffic zones.
Typical guidance: E5® Internal Cure ~4 fl oz/100 lb cementitious (plant-added); E5® Catalyst applied after floating; E5® Miracle Aid 500–1,000 sq ft/gal during finishing; E5® Shot Cure 6–12 fl oz/100 lb for challenging mixes/shotcrete. Always run trial mixes/mockups and follow proper sequencing.
Do not dilute or pre-blend concentrates; add admixtures individually and apply topicals at the correct finishing milestone. Coordinate with polishing/coating systems and environmental conditions to lock in finish quality and warranty paths.
E5® Finishability Solutions are made for large placements and appearance-sensitive floors where smooth, dense surfaces and reliable schedules matter. By stabilizing the finishing window and densifying the wear layer, the system delivers uniform sheen, higher FF/FL, and better long-term appearance. Crews gain control; owners gain finishes that stand up to use and cleaning.
Consistent, hygienic finishes that resist staining and withstand frequent cleaning.
Systemized finishing and densification support appearance and durability targets without post-pour sealers. Specs tie to recognized measures like FF/FL and surface hardness/density.
Owners get the finish they expect on day one—and a surface that holds up under cleaning and traffic.
Plant-added dosing and clear sequencing reduce on-site variability. Fewer finishing complaints strengthen relationships with GCs and owners.
Consistent, finish-friendly mixes mean fewer callbacks and smoother pour days.
Reduce drag, extend the workable window, and achieve uniform sheen across big placements. Crews finish faster with fewer passes and fewer defects.
A denser, harder surface means fewer callbacks and better results under side-lighting, polishing, or coating.
Stabilize the finishing window and cut extra steps that derail the critical path. Higher FF/FL and fewer appearance issues reduce rework and punch-list churn.
Earlier, more reliable turnover keeps downstream trades moving and protects budget.
Dense, uniform surfaces resist dusting and wear, protecting the brand experience. Less rework and fewer claims keep spaces open and budgets sane.
Maintenance teams benefit from easier cleaning and longer intervals between refurbishment.
Need smoother, denser finishes without extra water or sealers? Share your project details and we’ll recommend the right E5® finishability system—dosing, sequencing, and spec language included.
2025 Copyright. All rights reserved. Site built with Sprocket Rocket & HubSpot. Privacy policy Terms